Commit Graph

10 Commits

Author SHA1 Message Date
Kazem Alghasi
b35e933475 Phase 3.5 — Core Features Complete:
 Multi-Package Support (3.5.1)
- Add shipment_packages migration and ShipmentPackage model
- Add packages() relation to Shipment model
- Update CustomerOrderController to accept packages[] array
- Auto-calculate volumetric weight from dimensions (L*W*H/5000)
- Repeater UI for adding/removing packages
- Real-time summary of total weights

 Invoice Form for PARCEL (3.5.2)
- New step in order form (only for PARCEL type)
- Customs items: description, HS Code, quantity, unit price (USD)
- Auto-calculate total per item and invoice total
- Maximum 9 items
- 5-step order form structure

 PDF Redesign (3.5.4)
- Install picqer/php-barcode-generator
- Redesign AWB with barcode, From/To, Value, Service, Type
- Redesign Invoice with 9-row table, legal declaration
- Redesign Label to A5 landscape with large barcode
- DOC/PARCEL condition (only PARCEL has invoice)
- Barcode as base64 embed

 Technical Fixes (3.5.5)
- Add Enum casts to Shipment model (status, direction, type)
- Fix deselectAfterCompletion -> deselectRecordsAfterCompletion
- Migration for shipment_items (row_number, unit_price)
- Migration to make name nullable
- Fix Enum method names (DocNormal/DocEconomy)

 Tracking Test (3.5.6)
- Update TrackController with status_label
- Redesign tracking page with beautiful timeline
- Status box with colored badge
- Timeline with date, description, location, source
- Carrier mappings section

Documentation:
- Update README, Laravel_README, Roadmap, Checklist
- Add IFNEX_Meeting_Summary.md for client presentation
- Update IFNEX_I18N_Strategy.md (moved to deploy phase)

Phase 3.5 — 90% complete (i18n moved to deploy phase)"
2026-08-29 08:35:34 +03:30
Kazem Alghasi
b5e136a76d docs(roadmap): introduce phase 3.5 and future commercialization plans
Update project documentation to reflect the transition from Phase 3 to
a new critical refinement phase (Phase 3.5) and outline long-term
strategic goals.

Key documentation updates:
- Added Phase 3.5 (Essential Refinements) to the roadmap and checklist,
  focusing on multi-package support, parcel invoice forms, and
  internationalization (i18n).
- Defined Phase 5 (Commercialization) including tiered subscription
  models (Starter, Business, Enterprise) and premium features.
- Created `IFNEX_Commercial_Model.md` to detail monetization strategies.
- Created `IFNEX_I18N_Strategy.md` to outline the multi-language
  implementation approach using Polylang.
- Updated `README.md` with the revised project lifecycle and new
  documentation references.
2026-08-29 05:19:54 +03:30
Kazem Alghasi
a1a6dbdd8a feat(core): complete phase 3 integration and enhance country/phone features
This commit marks the completion of Phase 3 (Integration and Improvements) and updates the project status to reflect that Phases 0 through 3 are finished.

Key changes include:
- **Laravel (Backend):**
  - Added `calling_code` column to `countries` table via new migration.
  - Added scripts to update calling codes for all countries.
  - Updated `CustomerOrderController` to include `calling_code` in country data.
  - Registered `api_key` middleware alias in `bootstrap/app.php`.
  - Improved error handling to return JSON 401 for API authentication failures.
  - Updated `README.md` with detailed architecture and feature descriptions.
- **WordPress (Frontend/Bridge):**
  - Added `ifnex_wallet_charge` shortcode and AJAX handler for wallet top-ups.
  - Implemented auto-fill for calling codes in the order form based on selected country.
  - Added real-time phone number validation (digits, +, spaces only).
  - Added English-only validation for name, city, and address fields with UI warnings.
  - Updated asset enqueuing logic and versioning for CSS/JS.
- **Documentation:**
  - Updated `IFNEX_File_Map.md`, `IFNEX_Phase0_Checklist.md`, and `IFNEX_Roadmap.md` to reflect completed phases and new features.
  - Updated `DEPLOYMENT.md` with new environment variables (`IFNEX_BRIDGE_API_KEY`) and required WordPress pages.
  - Updated project `README.md` with comprehensive feature list and system architecture.
2026-08-29 04:38:28 +03:30
Kazem Alghasi
6a4a619261 docs: update project documentation and roadmap
- update `IFNEX_File_Map.md` to include new migrations and models from phases 2 and 3
- update `IFNEX_Phase0_Checklist.md` to reflect completed status of phase 0 and progress on subsequent phases
- add `IFNEX_Roadmap.md` to outline project milestones and future development stages
2026-08-28 22:04:01 +03:30
Kazem Alghasi
48c88e9bc7 refactor(shipment): update direction enums and shipment import logic
Refactor the shipment direction logic from 'outbound/inbound' to 'export/import' to align with the new database schema requirements. This includes updating the `ShippingRatesImport` logic, adjusting the Excel import sheet mappings, and removing the AED to IRR conversion during import as rates are now stored in AED.

Additionally, updated the shipment view action to open PDF documents in a new tab and updated the Phase 0 checklist with the new database schema requirements.

- docs: update Phase 0 checklist with new schema requirements
- refactor(ui): update shipment view actions to open in new tab
- refactor(import): update shipping rates import to use new direction enums and AED values
- docs: add file map and new excel document
2026-08-23 21:33:56 +03:30
Kazem Alghasi
cd8021e6e1 docs: update project documentation and roadmap to reflect phase 2 and 3 completion
Update project documentation, status reports, and technical READMEs to
reflect the successful completion of Phase 2 (Financial Automation) and
Phase 3 (Customer Portal & WordPress Integration).

Changes include:
- Updated `STATUS.md` and `README.md` to mark Phases 2 and 3 as completed
- Updated `01_Documents/IFNEX_Phase0_Checklist.md` with detailed task
  completion status for Phases 1, 2, and 3
- Refined technical architecture documentation in `04_Laravel/README.md`
  to include new services (Zarinpal, OrderPayment), controllers (Auth,
  CustomerOrder), and Filament resources (Wallet, Payment, DiscountCode)
- Added `DEPLOYMENT.md` for deployment instructions
- Updated system specifications to include Laravel Sanctum, RBAC via
  spatie/laravel-permission, and the updated WordPress/IFNEX Bridge
  capabilities
2026-08-10 18:12:49 +03:30
Kazem Alghasi
285acdae89 docs(project): update project status, roadmap, and documentation
Update project documentation to reflect the completion of Phase 0 and Phase 1, and the commencement of Phase 2. This includes archiving obsolete documents, updating the README with a new architectural overview, and refining the project checklist and status reports.

- Archive obsolete PRD and Roadmap documents
- Update `IFNEX_Phase0_Checklist.md` with completed tasks and Phase 2 roadmap
- Update `STATUS.md` with recent development progress for August 2026
- Refactor `04_Laravel/README.md` to include detailed technical specifications and architecture diagrams
- Update root `README.md` with updated versioning and system architecture visualization
- Refine `PriceCalculatorServiceTest.php` to align with updated service output structures
2026-08-07 05:58:12 +03:30
Kazem Alghasi
d6095265e7 docs: update phase 0 checklist and project status
Update the project documentation to reflect the successful completion of all Phase 0 tasks, including Filament manual testing, tracking data migration, WordPress bridge plugin development, and API testing.

- Mark all R1-R5 items as completed in `IFNEX_Phase0_Checklist.md`
- Update `STATUS.md` to show completed status for high and medium priority tasks
2026-08-04 05:59:29 +03:30
Kazem Alghasi
11845173b6 chore(docs): update project status and resolve data migration blockers
Update project documentation to reflect the resolution of previous data migration blockers and the availability of new tracking data.

- Update `IFNEX_Phase0_Checklist.md` to reflect that historical shipment imports are no longer blocked and that tracking data is now available.
- Revise `STATUS.md` to remove references to the 3950-record migration requirement and update the roadmap to focus on tracking data migration using the newly provided Excel file.
- Add `Data entry 2026-06-28.xlsx` as the primary source for tracking data migration.
- Reorganize the remaining tasks in the checklist and status reports to reflect the current project state.
2026-08-04 02:28:19 +03:30
Kazem Alghasi
a59e192b32 ۱۰ مورد کامل شد (دیتابیس، مدل‌ها، API، Filament، Laravel 11، رفع باگ‌ها)
🔄 در حال انجام: تست دستی Filament
⏸️ بلاک: مهاجرت ۳۹۵۰ رکورد (منتظر فایل اکسل اصلاح‌شده)
⏸️ بلاک: پلاگین وردپرس (بعد از تست کامل API)
2026-08-04 01:59:08 +03:30